Precautions For Laying Tiles
Apr 24, 2023
Leave a message
Precautions for laying
1. Before laying, please check whether the product model, grade, size and color number shown on the package are consistent. If you find any objection to the product quality, please contact the factory or dealer as soon as possible. Once it is laid, it will not be clear .
2. Before paving, the object to be pasted or the ground should be dealt with first. The base layer of the dry paving method can only be paved when the hardness reaches a certain level. When paving, the joints should be adjusted between 2-3mm.
3. Before paving, the tiles often need to be soaked in clean water for 20-30 minutes, and the water can be filtered before paving, otherwise the tiles will easily warp after the water evaporates after paving. And before use, you should check whether the color number and size marked on the outer packaging are the model you ordered, and whether the bricks with the same color number have defects such as color difference and broken wires. Only by using a uniform color number can the color be uniform.
4. It is recommended to use No. 325 cement, and the participation ratio of dry paving method
Base layer: (cement: fine sand=1:3), paste layer: (cement: fine sand=1:2).
5. If the pattern features are obvious, please look for the characteristics of the pattern and keep paving in a uniform direction. If the pattern features are not obvious or there is no pattern, please combine the construction effect with the requirements of paving.
6. After the paving is completed, the cement stains remaining on the brick surface should be wiped off in time. The ground that has been paved needs to be maintained for 4-5 days to prevent the ground from being partially uneven due to external forces.